
The project, which started in September 2024, was passed on officially to CNU after its completion for the drainage and water system. The water tank can store up to 7.5 cubic meters of water which assures a reliable water supply for the Campus, especially that the dry season has entered the country.
The ceremony was jointly participated by the CNU officials led by Dr. Daniel A. Ariaso Sr. and Engineer Melbern Abello, DPWH personnel and project in-charge, together with CNUB Faculty.



This ceremony is one of the living proofs that the leaders of the institution will not stop as they continually aimed to beautifully allow their Campuses to grow in many aspects possible, thus, making it more capable of doing what it has always done – excellence.
Words : Anelyn B. Tacuyan
Photos: CNU FB Page, CNUB Faculty and Staff